Inerting and blanketing
Keeping tanks, vessels and lines under a nitrogen atmosphere during maintenance, storage or catalyst handling.
Nitrogen purging services in NEOM for construction and infrastructure projects, utilities and energy facilities and other sites across NEOM. We purge, inert, dry and leak test systems with nitrogen and confirm every vent against your target.
Nitrogen Purging in NEOM
NEOM in the far north-west is a giga-project region, with large-scale construction, new utilities and energy infrastructure, including green hydrogen and desalination projects, and extensive structural steel and equipment installation. Everything is new build, so the focus is on construction quality, commissioning readiness and strict project HSE standards.
NEOM's new utilities and energy systems need nitrogen drying, purging and leak testing before commissioning. For hydrogen and other high-specification systems, cleanliness, dryness and documented acceptance are critical, and we record every step for the commissioning dossier.
Our nitrogen purging services in NEOM use the same calibrated equipment, procedures and reporting we use on sites across the Kingdom.
Purging usually follows hydrotesting, when lines have been drained and need drying, and joints that leak during a nitrogen leak test are corrected straight away by bolt torquing.
What we offer
Keeping tanks, vessels and lines under a nitrogen atmosphere during maintenance, storage or catalyst handling.
Pressurising systems with nitrogen to check flanged joints and connections before start-up, with leaks fixed by our bolting crew.
Purge plans, monitoring logs and completion certificates for each system, ready for your hand-over files.
Our bolting crews mobilize with calibrated equipment across Saudi Arabia, 24 hours a day.
FAQ
Yes. We dry, purge and leak test new systems with nitrogen to the commissioning procedure and provide full records for hand-over.
Yes. We provide method statements, risk assessments, competency records and calibration certificates in the format each NEOM contractor requires, and follow project HSE rules on site.
Yes. We pressurise the system with nitrogen, check flanges and connections for leaks, and our bolting technicians can re-torque or remake leaking joints immediately.
Other locations
We provide nitrogen purging, inerting and drying at plants, pipelines and project sites across the Kingdom. Choose a location for local details.
Request a quote
Send us your joint details and schedule, and then a bolting specialist will reply with a recommended method and a quotation.
Eastern Province
Kingdom of Saudi Arabia
Sun–Thu, 7:00 AM – 5:00 PM · Emergency call-out 24/7
We aim to respond within one working day.