Pneumatic testing
Where water cannot be used, pneumatic tests with the additional precautions and exclusion zones they require.
Hydrotest services in Yanbu for Yanbu Industrial City, refineries and petrochemical plants and other sites across Yanbu. We test piping, pipelines and vessels to the approved test pack, then drain, dry and reinstate the system.
Hydrotest in Yanbu
Yanbu Industrial City on the Red Sea hosts export refineries, petrochemical plants, crude and product export terminals, and large desalination and power plants, all run under the Royal Commission. It is the west coast's main hydrocarbon hub, with marine corrosion and terminal operations shaping much of the maintenance work.
Refinery, petrochemical and terminal piping in Yanbu is hydrotested after modifications and repairs, often on alloy and stainless systems where water quality matters. We test to the approved packs, then drain, dry and reinstate the joints with controlled torque.
Our hydrotest services in Yanbu are planned with your operations and safety teams and carried out under your permit-to-work.
Most systems we test have just been modified, often with new sections installed after pipe cold cutting, and once the test is passed we can dry them by nitrogen purging before commissioning.
What we offer
Where water cannot be used, pneumatic tests with the additional precautions and exclusion zones they require.
Preparing and reviewing test packs, marked-up drawings, limits, blinds and vent and drain points before testing.
Dewatering after the test and drying with air or nitrogen to the condition required before commissioning.
Our bolting crews mobilize with calibrated equipment across Saudi Arabia, 24 hours a day.
FAQ
Yes. After the test we remove blinds, fit new gaskets and tighten every joint with calibrated tools, recording each one for the hand-over package.
Yes. We follow Royal Commission and operator requirements for access, permits and HSE in Yanbu Industrial City, and provide the documentation each facility needs before work starts.
Yes. Our hydrotest services in Saudi Arabia include draining the system after the test and drying it with air or nitrogen to the dew point or dryness your commissioning procedure requires.
Other locations
We provide hydrotesting at plants, pipelines and project sites across the Kingdom. Choose a location for local details.
Request a quote
Send us your joint details and schedule, and then a bolting specialist will reply with a recommended method and a quotation.
Eastern Province
Kingdom of Saudi Arabia
Sun–Thu, 7:00 AM – 5:00 PM · Emergency call-out 24/7
We aim to respond within one working day.