Hydrostatic testing
Testing piping, pipelines and equipment with water to the pressure and hold time set by the code and your specification.
Hydrotest services in Haradh for gas processing plants, oil production facilities and other sites across Haradh. We test piping, pipelines and vessels to the approved test pack, then drain, dry and reinstate the system.
Hydrotest in Haradh
Haradh lies at the southern end of the Ghawar field, deep in the desert, with one of the Kingdom's major gas processing plants, oil production facilities, and remote pipelines and stations. Distances, heat and limited local services mean jobs here succeed or fail on planning and self-sufficiency.
Hydrotests on remote Haradh pipelines and gas plant piping need water brought in, stored and disposed of properly. We plan the full sequence in advance and run the test with calibrated recorders, then drain and dry the system with air or nitrogen before restart.
Every job under our hydrotest services in Haradh starts with a site survey and a written method statement, and ends with a record of the work for your files.
Because leaks during a test usually come from flanged joints, every joint is made up by bolt torquing beforehand, and any flange damage is corrected by flange facing before the test is repeated.
What we offer
Testing piping, pipelines and equipment with water to the pressure and hold time set by the code and your specification.
Preparing and reviewing test packs, marked-up drawings, limits, blinds and vent and drain points before testing.
Dewatering after the test and drying with air or nitrogen to the condition required before commissioning.
Our bolting crews mobilize with calibrated equipment across Saudi Arabia, 24 hours a day.
FAQ
Water source, storage and disposal are agreed with the site before testing, as part of the test plan, because remote locations rarely have test water on hand.
We confirm scope, drawings and site requirements before leaving, and travel with everything the job needs, including spare tooling, consumables and gaskets, so work is not stopped by a missing item.
Water is almost incompressible, so very little energy is stored in the system. If something fails during a hydrotest it leaks rather than bursting violently, which makes it much safer than a pneumatic test.
Other locations
We provide hydrotesting at plants, pipelines and project sites across the Kingdom. Choose a location for local details.
Request a quote
Send us your joint details and schedule, and then a bolting specialist will reply with a recommended method and a quotation.
Eastern Province
Kingdom of Saudi Arabia
Sun–Thu, 7:00 AM – 5:00 PM · Emergency call-out 24/7
We aim to respond within one working day.