Printable Shutdown Bolting Checklist

A one-page checklist for flange bolting on a turnaround, from planning to start-up. Tick it on screen, print it, or save it as a PDF.

Shutdown bolting checklistSource: bolttorquing.com

Plant / unit:

Shutdown dates:

Joint register ref:

Bolting supervisor:

3 to 6 months before the shutdown

2 to 4 weeks before

Opening joints

Inspection

Closing joints

Before and at start-up

Checked by:

Signature / date:

This is the printable form of our shutdown bolting checklist article, which explains each step. For the wider plan, read planning a plant shutdown in Saudi Arabia.

Free resources

More free tools

Request a quote

Need a bolting crew? Talk to our team

Send us your joint details and schedule, and then a bolting specialist will reply with a recommended method and a quotation.

We aim to respond within one working day.

Request a quote for bolt torquing services

Scroll to Top